The progress continues at a quick pace with continued emphasis on quality. The concrete has been poured for the office and storage area. The framing is continuing with completion for inspection due at the end of the week. The pool perimeter drainage trenches have been layered with drainage materials and fill.

An additional structure problem was found on one of the pillars at the front entrance. A steel beam will be added to reinforce the concrete where it is cracking per the structural engineer and as completed in other areas that had structural concrete cracks.