The pouring of the stamped concrete started today. The pattern selected for a pool area will enhance drainage. The variations in the flagstone color look like natural pigments. The coping around the pool and hot tubs is complete and matches the coloring in the stamped concrete. The insulation is complete and inspected. The dry walling is 75 % complete with completion scheduled for Friday. The game room and weight room are starting to look like they are ready for a game of Pac Man and a good workout. A state electrical inspector has passed the electrical rough-in. The skylight area above the pool has been prepared for plastering. Get ready for a swim in the new pool area. The drains for the new roof have been set. The steel posts that were delivered last week have been installed to reinforce the entry to your new amenities area.